House Progress: Insulation and sheet rock 8/27/2008





Zach is sleeping better now that the insulation is in and the sheet rock has been completed throughout the house. Now insulation will need to be blown in on top of the sheet rock to finish insulating the house. The sheet rock passed inspection today and the contracter has started taping and doing whatever else they need to do.

We are going to start picking out the interior finish products like doorknobs, interior doors, stair rail, etc. tomorrow. The curb, gutter, sidewalk and handicap ramp have been installed and we should get asphalt soon to patch across the road and to connect the existing road to the curb and gutter.

I am not sure what order everything goes in now but things are still moving quickly.

Wednesday, August 20, 2008

House Progress: 4-way inspection and curb gutter and sidewalk 8/20/2008





I haven't posted anything for a few days but it isn't because progress wasn't being made on the house. We just passed the 6 week mark which was on the 18th and the plumbing, electrical, heating and air conditioning have been roughed in and the doors and windows have been installed. The deck has been built and the sidewalk is in and the curb and gutter will be completed tomorrow. The fireplace was installed today and they will begin insulating the house tomorrow. I am excited to see what the next six weeks will bring.

Saturday, August 9, 2008

House Progress: Plumbing 8/9/2008






The rough plumbing has been completed on our house and all the subs are getting in and out quickly. The HVAC company has started cutting holes in the floor and they should be back next week to get the ducts ran and install the furnace.
Zach has a lot of fun seeing the progress on our house and he isn't afraid to pick up a broom and help clean up at the end of the day.

Thursday, August 7, 2008

House Progress: road crossing and a few shingles




A few days have gone by since the last post and we have made more progress with the house although the progress is a little less visible. The 400 east road crossing is complete thanks to John and Lindon. The waterline trench is ready to have the waterline ran to the house and the plumbing has been started. I will post more updates tomorrow.

Thursday, July 31, 2008

House Progress: we have a roof 7/31/2008

Another day has gone by and more progress has been made as the plywood was placed on the trusses. I am not sure what the next step will be but hopefully I will find out tomorrow.

Wednesday, July 30, 2008

House Progress: Trusses 7/30/2008








After a two day lull in the action as we waited for the trusses to be built they were finally delivered on 7/29/2008 and put on the house today.

Saturday, July 26, 2008

House Progress: Framing 7/22 - 7/25



The basement and floor joists were framed in on Tuesday & Wednesday

The exterior walls were framed on Wednesday & Thursday


The interior walls were framed on Friday


After only four days since we updated the house progress it is hard to imagine that so much could be done. The framing company even worked 10+ hours on the 24th of July which is a holiday in Utah.

Friday, July 25, 2008

The Rodeo!!!



We went to the Rodeo on Tuesday night with my Family. We weren't sure how much Zach would like have to sit the whole time. But he did pretty good. He liked all the horses and the sheep. He cheered for Corbin and Trey during the mutton bustin! He would get really excited every time they would let someone out of the shoots on a bucking horse. He also loved the music and he danced to the songs. He also would clap when the audience cheered. We had a good time watching him have fun. We will have to go again next year!

driving the truck



After the fishing trip and two red bulls I asked Zach to back in to hook up the boat trailer while I watched him and he did a great job. This kid can drive anything.

Fishing Day


I had to add this to the blog. When we went fishing Zach did not take a nap in the morning and he normally does take a nap. By the afternoon when we started the trek back to the docks Zach was driving the boat and he did his best to stay awake.

He took his job of getting us back very seriously but you can see the sleepiness taking over.

Monday, July 21, 2008

House Progress: Concrete for basement and garage floor completed & Lumber delivered - July 21st


Lumber for framing



Basement


Garage

I am all caught up with the progress of our house. I think that it is coming along rather quickly, but what the heck do I know I have never built a house before. It should start getting framed tomorrow. We are very excited and we are having fun watching as it goes up.





House Progress: Prep basement and garage for concrete - July 18th


Basement


Garage